Дома > Вести > Company News

PPR цевки лесна конструкција и долг работен век

2018-11-15

PPR Pipes laying can be divided into the installation of equipment, dark equipment laying, overhead laying and laying and other laying methods. As the PPR Pipes by the environment and the impact of medium temperature changes, it is appropriate to use the dark, the construction should be with the construction, structure, electrical and other professional closely with each other, coordinate each other, do a good job reservation, burial work, and take appropriate protection Measures. The wall should be reserved for the pipeline, the pipeline laying a good pressure should be filled around the tube at least 20mm thick rock wool and other soft materials to prevent the condensation of the pipeline or due to temperature changes in the pipeline deformation and destruction of the wall. Dark pipe should be completed in the civil and decoration after the completion of the second system test pressure, ruled out due to civil or decorative damage caused by the pipeline, after acceptance can be put into use.

Внатрешна инсталација на ППР цевка, треба да се изврши по завршувањето на цивилната декорација, со инсталирање на почвата пред правилната дупка или вградената обвивка. Гасоводот низ подот треба да се постави кога челичната обвивка, спецификациите на обвивката треба да бидат поголеми од PPR дијаметарот два, 50 mm над земјата. PRидот на ППР цевката треба да се постави кога челичната обвивка, двата краја и нивото на wallидот.

Закопано поставување PPR цевки. Ровот треба да биде упаднат по ровот на крајот од ровот на крајот, не треба да има кал и истакнати тврди предмети, ако има тврд материјал, треба да се постави во ров на крајот на перницата со дебелина од 100 mm, набивање на прскалка , по завршувањето на поставување цевки. Како што се закопани цевки во фитинзи за метални цевки, приклучоци за цевки треба да се направи антикорозивен третман. Поставувањето на цевководи мора да се изврши според стандардниот тест за притисок на вода GB50242-2002, квалификуван пред полнење на полнење. Пополнување на ровот, цевката од двете страни на цевката и горниот дел од 200мм во рамките на употребата на песок или со дијаметар помал од 12мм на почвата не содржи тврди предмети наполнети, нежно измешајте, а потоа горниот дијаметар од 30мм под мекото полнење на почвата Чекор по чекор.

Such as easy to find and repair the pipeline, with the PPR Pipes at the same time laying a pipe with anti-corrosion wire (available rubber metal wire), so that after the metal pipe detector to facilitate the use of metal pipe detector to determine the location of PPR pipe, easy maintenance. Buried laying PPR pipes should be below the depth of the local permafrost. Through the road or structure, should be added steel casing, casing length or width of the structure plus 1m, casing diameter should be larger than the PPR pipe diameter two.

PPR pipe has a lot of metal pipes do not have the characteristics, it is corrosion-resistant, non-scaling, smooth pipe wall, effectively prevent the water in the pipeline in the secondary pollution, and beautiful. Construction convenience, speed up the construction speed. PPR Pipes long life, can reach five times the life of galvanized pipe, basically up to the maintenance-free, greatly reducing the maintenance of operating costs. Therefore, PPR pipe in the future water supply project will be more widely used.

For PPR pipe installation, we can not be so professional, but understand the most basic welding steps can help us better check whether the installation of water pipes in line with the norms, so that the safe use of water pipes can be guaranteed.

1, на површината на цевката и споеви да се обезбеди чиста, мазна, без масло.

2, треба да се обележат во гасоводот за да се обидат да го вметнат. (Еднаква на длабочината на прицврстување на спојот).

3, the entire embedded to carry out the depth of heating, including pipes and joints, are carried out in the welding tool.

4, за да се заврши времето за греење, гасоводот непречено и рамномерно се наметнува во споеви, така што нивната комбинација на цврста и совршена.

5, in the pipe joint welding within a few seconds, you can adjust the connector position.

6, за краток временски период, конекторот може да биде со товарот.

7, with a self-adjusting hot-melt welding machine to pipe and pipe welded together, the temperature is 260 ° C.

8, машината е поврзана со напојувањето (220v) и почекајте за момент, кога трепка зелено светло што ја достигнало температурата на заварување, започнало да работи.

9, бидејќи материјалот е лесен, флексибилен, целото заварување може да се изврши на масата, оваа предност може да заштеди човечки часови.

10, понекогаш во wallидот за да направите некои врски, треба да обрнеме внимание на заедничката локација во работниот простор, можете да работите. Ако температурата на околината е под 5 ° C, времето за греење се зголемува за 50%.


X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept